Test report DSG-4911 · Rev F · tested November 18, 2026
AI Datacenter InfrastructureDevice under test
Patmos to Convert Former Alabama Walmart Into 50MW Data Center
Patmos will turn a former Fairfield, Alabama Walmart into a 205,000 sq ft data center campus, opening with 20MW in May 2027 and scaling to 50MW. The site sold for around $32m.
- Read
- 3 min
- Words
- 534
- Node
- 65nm
- Operator
- Grace Kim
Spec summary
- Patmos plans a 205,000 sq ft data center in Fairfield, Alabama with initial 20MW capacity, expandable to 50MW, starting operations May 2027.
- The site, a former Walmart that closed in 2016, reportedly sold for around $32m after Safe Space Cos. bought it for $1.95m in 2022.
- Patmos will pay the full cost of electric service under agreed terms with Alabama Power.
- Patmos operates four existing data centers in Kansas City, Dallas, and Phoenix.
- Fairfield Mayor Herman Carnes Jr. endorsed the redevelopment of the long-vacant property.

Hosting firm Patmos will redevelop a former Walmart outside Birmingham, Alabama into a technology campus with an initial 20MW of capacity, scalable to 50MW of utility power. The company announced the project this week. Operations at the 205,000 sq ft (19,045 sqm) site in Fairfield, Jefferson County, are expected to begin in May 2027.
The facility is designed for high-density workloads. Patmos has agreed terms with Alabama Power for electric service, under which the data center firm will pay the full cost of serving its energy needs.
CEO John Johnson framed the project as a departure from standard builds. "We don't build data centers in the traditional sense," he said. "Our data centers power mixed-use technology campuses that create job-dense tech ecosystems and new opportunities for communities. We also retrofit existing buildings, so we're not destroying local farmland."
He added: "We're excited about the opportunity to bring new infrastructure and investment to Fairfield, and we look forward to building relationships with the people and businesses who call it home."
What happened to the site?
The property at 7201 Aaron Aronov Drive has changed hands repeatedly since Walmart exited in 2016 as part of a wave of Alabama store closures. Built in 2006 on just under 16 acres, it carries a long transaction history:
- 2019: Canadian investor Hammic Fairfield bought the site from Susbar Inc. for $1.2 million.
- 2022: Safe Space Cos., a Louisiana-based real estate redevelopment firm, paid $1.95 million, aiming to revive the property.
- Now: Local press reports the sale to Patmos at roughly $32 million — against a prior listing of $3.2 million.
Former NFL player Karlos Dansby had at one point hoped to build a grocery supercenter and distribution center on the land. That plan never materialized.
Fairfield Mayor Herman Carnes Jr. welcomed the deal. "I'm excited about this investment and the opportunities it represents for the future of Fairfield," he said. "For years, we have wanted to see new life brought to the former Walmart property, and I am pleased to see an important step toward realizing that vision."
What does this change for the Birmingham market?
It adds a fifth major player to the metro's data center map. Existing operators in the wider Birmingham area include DC Blox, Nebius, US Data Centers, and QTS — though none are located in Fairfield itself. Patmos currently runs four data centers across Kansas City, Missouri; Dallas, Texas; and Phoenix, Arizona. Its Kansas City site, a former Kansas City Star printing press, hosts Nebius.
News of a possible colocation facility in Fairfield first surfaced in July. Reports tying Patmos to the Walmart site followed in August.
Who is Patmos?
The company provides cloud, high-density compute, software, and data center solutions it claims are "free from the threat of Big Tech censorship." It markets itself as providing "refuge for the digital exile" and offers what it calls "uncancellable hosting solutions."
The Alabama project extends a pattern: retrofitting existing commercial buildings rather than building on undeveloped land. Whether the Fairfield campus hits its 20MW debut in May 2027 — and reaches the 50MW ceiling — will depend on power delivery timelines and tenant demand.
via datacenterdynamics.com (Source)
More from Grace Kim
Show full bio
Market editor covering regulation, policy and their impact on hardware layer of artificial intelligence at Die Signal.
665 articles
Same lot · LOT-362E
- DSG-669645nmAWS Files Plans for 36-Building Data Center Campus in Pennsylvania
- DSG-678128nmMicrosoft evaluates 1.4 GW Rockford data-center campus
- DSG-280028nmProject Jupiter's First Building Tops Out in New Mexico
- DSG-423345nmAnthropic-linked $366m data center filed in Cedar Creek, Texas
- DSG-190445nmKraft Group Eyes $16 Billion, 900MW Data Center Campus in Sutton