Test report DSG-1043 · Rev B · tested October 9, 2026
AI Datacenter InfrastructureDevice under test
LG CNS to Complete Blackwell-Based Modular Data Center This Year
LG CNS will complete a modular data center built on NVIDIA's Blackwell GPU platform by year-end, the Seoul Economic Daily reported, marking the Korean IT services firm's first disclosed Blackwell deployment.
- Read
- 2 min
- Words
- 491
- Node
- 14nm
- Operator
- Elena Vasquez
Spec summary
- LG CNS plans to complete a Blackwell-based modular data center by the end of the current year, per Seoul Economic Daily.
- Seoul Economic Daily did not disclose the facility's location, power capacity, GPU count or tenants.
- NVIDIA announced its Blackwell B100 and B200 GPU generation at GTC 2024, with shipments to hyperscalers beginning in H2 2024.
- South Korea's installed data center capacity reached approximately 1.5 GW in 2023, according to the Ministry of Science and ICT.
- LG CNS competes in Korea's AI infrastructure segment against Naver Cloud, NHN Cloud and Samsung SDS.

LG CNS, the IT services subsidiary of LG Group, will complete a modular data center built on NVIDIA's Blackwell GPU platform by the end of this year, the Seoul Economic Daily reported.
The headline, published by the Korean business daily, marks LG CNS's first disclosed Blackwell-based deployment and places the company alongside Naver Cloud, NHN Cloud and Samsung SDS in the country's AI infrastructure market.
What did Seoul Economic Daily report?
The Seoul Economic Daily reported that LG CNS will finish construction of the Blackwell-based modular facility within the current calendar year. The outlet did not disclose the site's name, location, IT load in megawatts, or contracted tenants. LG CNS has not issued a separate press release on the project as of the Seoul Economic Daily report.
What is a modular data center?
A modular data center is a prefabricated facility assembled from factory-built units — typically ISO-container or skid-mounted blocks — that operators integrate on-site. The format compresses construction timelines from years to months and lets providers scale capacity in increments tied to customer demand. Major hyperscalers have used modular designs to add GPU clusters faster than conventional ground-up builds allow.
What is Blackwell?
"Blackwell" designates NVIDIA's B100 and B200 generation of data center GPUs, announced at GTC 2024. The architecture succeeds the Hopper family (H100, H200) and targets large language model training and inference workloads. NVIDIA began shipping Blackwell systems to hyperscale customers in the second half of 2024, with the GB200 NVL72 rack-scale platform as the flagship product.
Where does LG CNS sit in Korea's data center market?
LG CNS operates separately from LG Electronics and LG Energy Solution. The company has built its revenue on systems integration, ERP rollouts and cloud migration for Korean enterprises. A Blackwell-based modular facility would extend that footprint into AI infrastructure-as-a-service, where competitors Naver Cloud and NHN Cloud have already announced multi-megawatt AI campuses.
How fast is Korea building AI capacity?
South Korea's Ministry of Science and ICT put the country's installed data center capacity at roughly 1.5 GW in 2023. Operators including Naver, Kakao and NHN have broken ground on AI-dedicated sites since 2023, and the ministry's 2024 data center survey recorded double-digit year-on-year growth in floor area and power draw across new builds.
What remains undisclosed?
The Seoul Economic Daily report did not specify:
- The site location or land area
- The facility's power capacity in MW
- The number of Blackwell GPUs deployed
- Anchor tenants or hyperscaler partners
- The construction partner or EPC contractor
- Capex or projected revenue contribution
LG CNS's investor relations channel and the company's official site had not posted a corresponding announcement at the time of the Seoul Economic Daily report. Investors will look to LG CNS's quarterly earnings call for confirmation of capex, capacity and go-live date.
via Google News: GPU datacenter (Source)
More from Elena Vasquez
Show full bio
Senior reporter covering industry trends and analytics at Die Signal.
82 articles
Same lot · LOT-C1B0
- DSG-11615nmGPU Supply Loosens, Data Centers Emerge as New Bottleneck
- DSG-826414nmNvidia Invests in Data Center Developer Cloverleaf Infrastructure
- DSG-462814nmAsian banks scale GPU financing for AI data centres
- DSG-39483nmSK Group and NVIDIA Expand Partnership on AI Factories and Memory
- DSG-95397nmNVIDIA and SB Energy Plan 10-GW AI Data Center Complex in Ohio