Test report · tested November 19, 2026
AI Datacenter InfrastructureDevice under test
Datrix begins with 12 carrier-neutral Latin American data centers
Stonepeak-backed Cirion has separated its data center arm as Datrix, which launches with 12 carrier-neutral facilities across six Latin American markets and published site specifications in Brazil.
- Read
- 3 min
- Words
- 511
- Segment
- AI Datacenter Infrastructure
- Operator
- Amara Osei
Spec summary
- Datrix launches with 12 carrier-neutral data centers in six Latin American markets.
- Nelson Fonseca, who joined Cirion in 2024, becomes CEO of the independent Datrix business.
- SAO1 has 20 MW and about 19,800 square metres; the Rio de Janeiro campus totals 89 MW and 22,100 square metres.
- CUR1 has 1 MW and 9,100 square metres of floor space.
- Cirion’s network exceeds 105,000 kilometres across 20 countries, with 18 cable landing stations and six international submarine cable systems.

By Amara Osei
Datrix has launched with 12 carrier-neutral data centers across six Latin American markets, separating Cirion Technologies’ data center operations from its connectivity business.
The Stonepeak-backed operator this week introduced Datrix as an independent company. Cirion will retain the telecommunications operation, while Datrix will focus exclusively on data center infrastructure. Cirion presents the separation as part of its growth strategy.
What changes under Cirion’s split?
The separation process began last year, when Cirion announced that it would divide its connectivity and data center units and appoint a chief executive for each. Santiago Londoño took charge of connectivity, while Nelson Fonseca, who joined Cirion in 2024 as president of the data center unit, assumed leadership of the data center operations.
Fonseca, now Datrix CEO, said: “The new brand reflects both the company’s legacy and its ambition for the future, with a clear focus on the rapid growth of cloud computing and AI in Latin America.”
Londoño, CEO of Cirion Technologies, said: “The region’s role in the digital economy over the coming decades will be defined by the infrastructure built today, and Datrix was created to support and help shape that future.”
A company statement said the brand draws on decades of infrastructure experience, roots in Latin America and a vision for global growth. The split leaves Cirion with connectivity and Datrix with data centers.
Where does Datrix operate?
Datrix’s 12 data centers cover Brazil, Argentina, Chile, Peru, Colombia and Ecuador. Four Brazilian sites comprise São Paulo’s SAO1, Rio de Janeiro’s RIO1 and RIO2, and Curitiba’s CUR1.
The disclosed Brazilian specifications are:
- São Paulo, SAO1: 20 MW of installed power and approximately 19,800 square metres (213,125 sq ft) of total floor space.
- Rio de Janeiro, RIO1 and RIO2: A campus totaling 89 MW and 22,100 square metres (237,882 sq ft).
- Curitiba, CUR1: 1 MW across 9,100 square metres (97,951 sq ft).
Outside Brazil, Datrix has a presence in Buenos Aires, Santiago, Bogotá, Quito and Lima. Brazil provides three disclosed capacity and floor-space profiles, while the remaining footprint reaches five additional national markets.
Who will Datrix serve?
Datrix will target hyperscale providers, cloud providers, regional and global companies, and content platforms. It also plans to address infrastructure demand generated by artificial intelligence.
The company links its target market to cloud computing and AI growth in Latin America. Its named customer groups cover large-scale computing capacity, cloud services, corporate demand, content platforms and AI infrastructure.
Datrix now addresses four named customer groups plus AI-driven infrastructure demand.
What infrastructure remains with Cirion?
Stonepeak spun Cirion out of Lumen in 2022. Its network spans more than 105,000 kilometres of fibre-optic cable across 20 countries and combines terrestrial routes with submarine systems.
The network includes 18 cable landing stations and six international submarine cable systems. These figures describe Cirion’s connectivity business rather than Datrix’s 12-center data center portfolio.
The split puts the fibre network under Cirion and the data center mandate under Datrix.
via datacenterdynamics.com (Source)
More from Amara Osei
Show full bio
Staff writer covering money, funding and market shifts around hardware layer of artificial intelligence at Die Signal.
777 articles
Same lot
- América Móvil, Oracle and Nvidia: Inside the AI Data Center Alliance
- FiveNines and Nexus Core Systems to build 20MW AI data center near Casablanca
- Vodafone-Backed JV Commits $1bn to Build Egypt's Largest Data Center
- G42 signs MoUs to build AI factory infrastructure in Greece
- AMD's 97% Data Center Jump vs Nvidia's 30x Claim: Where AI Buyers Stand