403 U.S. hyperscale data centers used an estimated 82 TWh a year
A Harvard-led estimate puts 403 hyperscale U.S. data centers at 82 TWh and 25.7 Mt of CO2, while warning the modeled footprint may already be larger in 2026.
- Read
- 4 min
- Words
- 794
- Node
- 14nm
- Operator
- Priya Raman
Spec summary
- 403 confirmed hyperscale sites consumed an estimated 82 TWh, or 1.8% of U.S. electricity.
- Estimated annual carbon dioxide emissions reached 25.7 Mt, with a modeled range of 21–31 Mt.
- Gas and coal supplied 53.9% of modeled power; renewables supplied 25.3% and nuclear 20.9%.
- Virginia hosted 142 sites and 21.4 TWh; PJM accounted for 32.8 TWh.
- The study window ended in April 2025; EIA pilot surveys covered 196 companies.

By Priya Raman
403 U.S. hyperscale data centers consumed an estimated 82 terawatt-hours (TWh) in one year, equal to 1.8% of national electricity use.
How large is the measured footprint?
A Harvard-led study, reported by Wired, examined 675 candidate sites supplied by data vendor Baxtel. Researchers confirmed 403 through satellite imagery and building-footprint maps, then recorded an average capacity of 39.9 megawatts (MW) and a median capacity of 36 MW per site.
The study defines hyperscale sites as facilities run by a cloud or content provider, or by a colocation operator serving one, with capacity in the tens of megawatts.
Michigan sold 99 TWh in 2024. The modeled hyperscale load therefore exceeded 80% of that state’s total electricity consumption.
How did researchers estimate demand?
No official body counts the actual grid draw from these data centers. For each site, the model multiplied maximum capacity by annual operating hours and an estimated utilization rate before aggregating results across the national site portfolio.
Researchers assigned each site to one of 23 grid regions. They then applied the Environmental Protection Agency’s average regional generation mix and summed the modeled electricity and carbon dioxide output. The method estimates demand and emissions rather than recording them directly. Such estimation may weaken arguments against data center buildouts.
The central estimate is 25.7 million metric tons (Mt) of carbon dioxide per year. The modeled range runs from 21 Mt to 31 Mt. The 2018 estimate was 10.5 Mt, making the new central estimate two to three times the earlier figure.
Lead author Gianluca Guidi said in a statement that the footprint “could already be substantially larger now in 2026.” The study window ended in April 2025, which limits how current the estimate remains.
Where is power demand concentrated?
Virginia contains 142 sites. Together, they account for an estimated 21.4 TWh, about one-quarter of the national hyperscale total.
PJM, the regional grid operator serving 13 states, including Virginia, and Washington, D.C., accounted for 32.8 TWh, or about 40% of modeled hyperscale load, the largest regional total in the study. Wired describes PJM as America’s largest grid. Virginia’s 21.4 TWh sits just below the 22.85 TWh estimate for all U.S. hyperscale sites in 2018.
The study ranked the top 10 states by attributed carbon dioxide emissions as follows:
| State | Sites | Electricity (TWh) | CO₂ (Mt) | CO₂ intensity (g/kWh) |
|---|---|---|---|---|
| Virginia | 142 | 21.4 | 7.0 | 325 |
| Iowa | 26 | 7.2 | 3.2 | 445 |
| Ohio | 38 | 8.8 | 2.9 | 325 |
| Texas | 22 | 4.6 | 1.5 | 333 |
| Nebraska | 8 | 3.5 | 1.4 | 395 |
| Oregon | 56 | 11.1 | 1.3 | 119 |
| Arizona | 12 | 3.2 | 1.3 | 401 |
| Oklahoma | 8 | 2.9 | 1.1 | 395 |
| Wyoming | 2 | 1.2 | 1.0 | 848 |
| Utah | 5 | 1.3 | 0.8 | 640 |
How does the power mix affect emissions?
The study attributed 38.2% of modeled electricity to gas, 15.2% to coal, 25.3% to renewables, and 20.9% to nuclear generation across all 403 modeled sites. Together, gas and coal supplied 53.9%.
Estimated carbon intensity stood at 314 grams of carbon dioxide per kilowatt-hour (g/kWh), about 10% below the 348 g/kWh average for the U.S. grid. The lower figure does not mean every site operates cleanly. Almost one-quarter of modeled load sits in regions with higher carbon intensity than the national average.
PJM’s nuclear-heavy mix and Oregon’s hydro-heavy mix help explain the lower aggregate. The study uses 2023 plant data. It does not trace which plant supplies which site, and it excludes clean-power contracts and credits. On-site generation, including gas plants, may also fail to appear in grid data.
What could change the estimate?
Many campuses now planned span hundreds or thousands of MW, leaving the study’s 36 MW median capacity materially below the scale of those coming projects. The April 2025 cutoff limits the snapshot’s currency. On-site generation can also sit outside the grid-data boundary. Both gaps leave room for the total to be higher.
What official data comes next?
An Energy Information Administration (EIA) spokesperson told Wired that the agency had completed pilot surveys of data center energy use. The agency used pilot results to design a broader sector survey, while the first round combined web questionnaires with in-person interviews across 196 participating companies.
The first pilots launched in March. They covered energy sources, electricity use, servers and cooling. Coverage did not include every state.
Corresponding author Francesca Dominici called quantifying health effects “an important next step.” Official numbers may be forthcoming, but the broader survey remains in design and the health assessment remains a next step.
via tomshardware.com (Source)
More from Priya Raman
Show full bio
Correspondent covering money, funding and market shifts around hardware layer of artificial intelligence at Die Signal.
661 articles
Same lot · LOT-362D
- DSG-305965nm403 US Data Centers Draw as Much Power as Austria
- DSG-61537nm403 U.S. Hyperscale Data Centers Emit 52.69M Tons of CO2
- DSG-59857nmUS hyperscale data centers rival Denmark’s CO₂ output
- DSG-76493nmDatacenters to Triple Power Consumption by 2030: Gartner Data
- DSG-84453nmFoxconn Prices NVIDIA Vera Rubin Datacenter at $47B per Gigawatt